Here is a small list of projects that were planned for the Spring work party event. While that did not happen there is still time to choose one grab a buddy and help out. Once complete or Started let Mark know and he will cross it off the list

  • Install the 2 south awnings COMPLETE
  • Move the 3rd awning to the Car Track Area
  • Build work table for car track area
  • Place weed/grass killer on car track
  • Design and work on Crawler track
  • Brushback the hillside between car track and Parking. (Trim Blackberries and tall Grass)
  • Build serving table around BBQ area
  • Paint flight tables
  • Replace top on 8 ft table
  • Cut blackberries going up to car track both ends
  • Install power and lights in the container Solar panel.
  • Dump Run . Old BBQ etc. stuff behind the Porti potties